Beach access improvement works at Corbawn Lane

 

 

Status:  Detailed design is completed.  A 3D survey of cliffs is completed.  Liaison completed with landowners. Tendering commenced in Quarter 3 2017.

Proposed works consist of the construction of 240 metres of cliff stabilisation measures at the pedestrian access to the seafront at the end of Corbawn Lane; underpinning of the existing concrete step structure; protection of the base of the cliff using rock armour and concrete wing walls to the existing concrete step structure.