A

Languages

Intro Text 

Beach access improvement works at Corbawn Lane

 

 

Status:   Tendering completed.  Pre-award process underway.

Corbawn Coastal Protection

Proposed works consist of the construction of 240 metres of cliff stabilisation measures at the pedestrian access to the seafront at the end of Corbawn Lane; underpinning of the existing concrete step structure; protection of the base of the cliff using rock armour and concrete wing walls to the existing concrete step structure.

Back