The scheme is part of the Sandyford Urban Framework Plan. The scheme comprises of the following:
- Provision of a new road link between the existing signalised roundabout at M50 Junction 14 and Blackthorn Road
- A link from the new road above to the existing cul-de-sac at Arena Road
- Replacement of the signalised roundabout at Junction 14 with a signalised junction
- Construction of a new signalised junction on Blackthorn Road
- Improvements to pathways, cycleways, and crossings and improvement of lighting and the local public realm.
The Part 8 Planning & Environmental report for this project is available to view below.