Status:  Construction commenced on 1st May 2018 for a period of 22 months.

SIAC/Mantovani Joint Venture, who are the main contractors for the construction of the project, have resumed work on the jetty.  An updated method statement has been received from the Contractor confirming that concrete containing plastic macrofibres will not be used in these underwater concrete pours.

Proposed works at Dún Laoghaire Baths including studio space for artists, an art gallery, a café and public toilet facilities, demolition and clearance of all other derelict structures on the site, Provision of a public walkway through the site connecting the coastal walkway at Newtownsmith to the East Pier coastal defences and ancillary works.

Grant funding of €1.1m has been made available from the European Regional Development Fund for Dun Laoghaire Baths Project under the Designated Urban Centre Grant Scheme (DUCGS).