Cherrywood SDZ Planning Scheme

Cherrywood SDZ is the single largest undeveloped land-bank in Dún Laoghaire-Rathdown, and is approximately 360 hectares in size, nestled at the foot of the Dublin Mountains, is strategically located between the M50 and N11 transport corridors approximately 1km north of where they fork from the M11 and approximately 8km south of Dún Laoghaire town centre.  Dún Laoghaire-Rathdown County Council, in recognising the area's strategic importance, applied to the Government for Strategic Development Zone (SDZ) status and the Government designated it as an SDZ in May, 2010.

Contact Details

Cherrywood Development Agency Project Team
Forward Planning Infrastructure Department
County Hall, 
Marine Road, 
Dún Laoghaire, 
County Dublin 

Tel: 01 2054325
Email: info@dlrcoco.ie

Public Planning Counter
Monday - Friday 10.00am - 4.00pm

Important Note

The Cherrywood Planning Scheme document list below under "Main Document" has been updated to incorporate recently approved Amendments to the Scheme i.e. Amendment 6 in respect of Residential Car Parking Standards (Section 4.2.10 of the Approved Scheme 2018), approved in January 2020 by An Bord Pleanála, Amendment 7 Beckett Road Realignment, approved in April 2021 and Amendment 8 Building Height & Density Review which was approved in July 2023. The Approved Amendments for this can be accessed here or by clicking on the Approved Amendments to Cherrywood Planning Scheme tab below. 

 

Please Note

There is a slight discrepancy in Chapter 4, on page 48 of the Cherrywood Planning Scheme, under Table 4.4: Minimum Residential car Parking Standards. (Please see image below for correct information). 

 

Table 4.4

 

Dún Laoghaire-Rathdown, in their role as the designated Development Agency for Cherrywood SDZ, had a statutory duty to draft and agree a Planning Scheme for the SDZ, which was approved by Council following a comprehensive public consultation in December 2012. This was then formally submitted to An Bord Pleanála who subsequently approved the Planning Scheme with modifications in April 2014. 

The front-loading of significant transport and social infrastructure (parks and schools) outlined in the Planning Scheme will ensure that the SDZ area will be transformed into a new vibrant community, with approx. 8,700 homes including a minimum of 10% social housing units, spread over the new Town Centre and 3 smaller Village Centres with superior transport links including an enhanced bus service and 5 Luas stops throughout.

Related Documents
Map of Cherrywood Planning Scheme
Location of Cherrywood Planning Scheme within Dún Laoghaire Rathdown –Map 1.2 of Planning Scheme Document
142.25 KB
Other file
Download
Aerial photograph of Cherrywood Strategic Development Zone Planning Scheme Area
Aerial view of Cherrywood SDZ
5.47 MB
Other file
Download
Cherrywood Planning Scheme 2014 (updated July 2023)
Cover & Contents.pdf
200.24 KB
PDF Document
Download
Chapter 1 - Planning Scheme.pdf
5.65 MB
PDF Document
Download
Chapter 2 - Proposed Development in Cherrywood.pdf
13.08 MB
PDF Document
Download
Chapter 3 - Cultural and Built Heritage.pdf
14.00 MB
PDF Document
Download
Chapter 4 - Physical Infrastructure.pdf
21.24 MB
PDF Document
Download
Chapter 5 - Green Infrastructure.pdf
12.16 MB
PDF Document
Download
Chapter 6 - Development Areas.pdf
29.69 MB
PDF Document
Download
Chapter 7 - Implementation - Sequencing and Phasing of Development.pdf
7.24 MB
PDF Document
Download
Appendix A - Primary Land Use Matrix Cherrywood Planning Scheme.pdf
86.08 KB
PDF Document
Download
Appendix B - Cultural and Built Heritage.pdf
6.17 MB
PDF Document
Download
Appendix C - References.pdf
111.15 KB
PDF Document
Download
Appendix D - Report on the proposal for an ecological buffer zone at Druid’s Glen.pdf
946.92 KB
PDF Document
Download
Appendix E - Tufa Springs Mitigation Requirements.pdf
8.31 MB
PDF Document
Download
Appendix F - Worked Examples of Development Areas Tables.pdf
68.54 KB
PDF Document
Download
Appendix G - List of Abbreviations.pdf
63.23 KB
PDF Document
Download
Appendix H - Indicative Street Sections showing Proposed Maximum Building Heights..pdf
5.70 MB
PDF Document
Download
Appendix I - Guidance with regard to Sunlight and Daylight Assessment of Proposed Developments.pdf
54.42 KB
PDF Document
Download
Approved Amendments to Cherrywood Planning Scheme
Approved Amendments 1- 4 to the Cherrywood Planning Scheme June 2017
403.83 KB
Other file
Download
Cherrywood SDZ - Approved Amendment Chapter 7 and Maps
5.07 MB
Other file
Download
Car Parking Amendment 2020 - Final Text
110.80 KB
Other file
Download
Proposed Amendment 7 Beckett Road Realignment
20.06 MB
Other file
Download
Amendment 8 Building Height and Density Review
19.28 MB
Other file
Download
Appropriate Assessment Screening Report
Appropriate Assessment Screening Report
989.15 KB
Other file
Download
Cherrywood Biodiversity Plan
Cherrywood SDZ Biodiversity Plan with cover
2.09 MB
Other file
Download
Figure 1 Habitats in Scheme area North
1.19 MB
Other file
Download
Figure 2 Habitats in Scheme area South
1.05 MB
Other file
Download
Figure 3 Winter Birds
814.05 KB
Other file
Download
Figure 4 Breeding Birds
892.59 KB
Other file
Download
Figure 5 Badger Survey
821.34 KB
Other file
Download
Figure 6 Otter Survey
833.94 KB
Other file
Download
Figure 7 Evidence of Deer
825.59 KB
Other file
Download
Figure 8 Bat Survey
872.41 KB
Other file
Download
Figure 9 Invasive Species
809.95 KB
Other file
Download
Figure 10 M50 Crossing Locations
826.86 KB
Other file
Download
Figure 11 Ecological corridors
899.12 KB
Other file
Download
Figure 12 Hedgerows Treelines & Woodland Habitats Greenspace
820.47 KB
Other file
Download
An Bord Pleanala Decision Cherrywood SDZ 2014
An Bord Pleanala Decision Cherrywood SDZ
2.13 MB
Other file
Download
Cherrywood Planning Scheme 2014 - An Bord Pleanála Order 2014
107.12 KB
Other file
Download
Amendment of Board Order – Providing Clarification to Modification 18 relating to Table 6.6.2 of the Cherrywood Planning Scheme - February 2015
32.64 KB
PDF Document
Download
SEA Environmental Report
SEA Statement
2.19 MB
PDF Document
Download
SEA Environmental Report
6.50 MB
Other file
Download
SEA Environmental Report Appendix I - Non Technical Summary
6.16 MB
Other file
Download
Access & Movement Strategy
Access and Movement Strategy 2018
3.33 MB
Other file
Download
Area Wide Travel Plan
Cherrywood Area Wide Travel Plan (updated August 2016)
3.49 MB
Other file
Download
Urban Form Development Framework UFDF
Cherrywood SDZ Urban Form Development Framework PART 1
8.05 MB
Other file
Download
Cherrywood SDZ Urban Form Development Framework PART 2
9.11 MB
Other file
Download
Amenity Space Guidance Document 2017
Cherrywood Amenity Space Guidance Document 2017.pdf
2.99 MB
Other file
Download
Cherrywood SDZ Wayfinding & Directional Signage Guidance 2023
CHERRYWOOD SDZ - dlr Wayfinding & Directional Signage Guidance 2023.pdf
17.87 MB
PDF Document
Download
Cherrywood Drone Footage
Drone footage of Cherrywood SDZ recorded in Q1 2020.

Cherrywood SDZ is the single largest undeveloped land-bank in Dún Laoghaire-Rathdown, and is approximately 360 hectares in size, nestled at the foot of the Dublin Mountains, is strategically located between the M50 and N11 transport corridors approximately 1km north of where they fork from the M11 and approximately 8km south of Dún Laoghaire town centre. Dún Laoghaire-Rathdown County Council, in recognising the area's strategic importance, applied to the Government for Strategic Development Zone (SDZ) status and the Government designated it as an SDZ in May, 2010.

We care about your feedback. Have your say.

Is this page useful?

Any concerns with your local area?

Report a problem with the Council